Size & height
Footprint, levels, elevation, and structural spans affect both material and labour.
Book My Free Site VisitCost & planning
A square-foot number cannot tell you what happens at the house, under the deck, around the stairs, or when the old structure comes out. We prefer a written scope you can actually compare.
Straight answers
These six factors usually matter more than the board colour.
Footprint, levels, elevation, and structural spans affect both material and labour.
Board line, layout, border details, fascia, hidden fasteners, and waste factor matter.
Direction, number of risers, landings, guard length, gates, glass, and handrails add complexity.
Soil, slope, machinery access, excavation, and utilities shape the approach.
Removal, disposal, unknown conditions, and whether anything can safely remain affect a rebuild.
Privacy, pergolas, lighting, skirting, benches, and protected space below should be scoped early.
Homeowner quote checker
The lowest total is not automatically the lowest-cost project. Mark each row as included, excluded, or still unclear before you compare the final numbers.
Ask us to explain a scope ↗Swipe sideways to mark every column →
Who prepares drawings, submits, pays fees, schedules inspections, and handles revisions?
Are footings, beams, joists, blocking, connectors, hardware, and framing specifications written down?
Is the exact manufacturer, product line, colour, board layout, fastening, fascia, and waste allowance named?
Are stair direction, landings, guards, handrails, gates, posts, and connection details included?
How will the deck meet the home, siding, doors, utilities, flashing, slope, drainage, or dry space below?
Are demolition, disposal, utility locates, machinery access, site protection, and cleanup included?
What is the proposed sequence, what can change it, and how are added costs approved before work continues?
Are deposit, progress payments, final payment, workmanship coverage, product coverage, and claim steps clear?
Tip: print this page or save it as a PDF, then write the contractor’s answers directly on the checklist.
WBD payment policy
The standard contract ties payments to visible points in the work. Your signed project documents show the exact dollar amounts and remain the final agreement.
The deposit reserves labour scheduling and allows materials, permit applications, and project scheduling to begin after funds clear.
The progress payment is due when the deck reaches substantial completion, as defined by the project scope.
The final payment is due after final completion and the passed final inspection.
Changes stay written: additions, deletions, substitutions, price changes, and schedule impacts require a signed change order before changed work proceeds. Invoices are issued through Jobber and are due on receipt.
No fake precision
We would rather explain a site-specific number than advertise a range that hides the features, exclusions, or construction details that actually drive cost.
Start with the space