Cost & planning

A useful price needs a useful scope.

A square-foot number cannot tell you what happens at the house, under the deck, around the stairs, or when the old structure comes out. We prefer a written scope you can actually compare.

Straight answers

What moves the price

These six factors usually matter more than the board colour.

01

Size & height

Footprint, levels, elevation, and structural spans affect both material and labour.

02

Surface & finish

Board line, layout, border details, fascia, hidden fasteners, and waste factor matter.

03

Stairs & railings

Direction, number of risers, landings, guard length, gates, glass, and handrails add complexity.

04

Foundation & access

Soil, slope, machinery access, excavation, and utilities shape the approach.

05

Demolition

Removal, disposal, unknown conditions, and whether anything can safely remain affect a rebuild.

06

Outdoor features

Privacy, pergolas, lighting, skirting, benches, and protected space below should be scoped early.

Homeowner quote checker

Take the same eight questions to every estimator.

The lowest total is not automatically the lowest-cost project. Mark each row as included, excluded, or still unclear before you compare the final numbers.

Ask us to explain a scope ↗

Swipe sideways to mark every column →

Scope itemWhat to verifyIncludedExcludedUnclear
01Drawings & permits

Who prepares drawings, submits, pays fees, schedules inspections, and handles revisions?

02Foundation & framing

Are footings, beams, joists, blocking, connectors, hardware, and framing specifications written down?

03Decking system

Is the exact manufacturer, product line, colour, board layout, fastening, fascia, and waste allowance named?

04Stairs & railings

Are stair direction, landings, guards, handrails, gates, posts, and connection details included?

05House & water

How will the deck meet the home, siding, doors, utilities, flashing, slope, drainage, or dry space below?

06Removal & access

Are demolition, disposal, utility locates, machinery access, site protection, and cleanup included?

07Schedule & changes

What is the proposed sequence, what can change it, and how are added costs approved before work continues?

08Payment & warranty

Are deposit, progress payments, final payment, workmanship coverage, product coverage, and claim steps clear?

Tip: print this page or save it as a PDF, then write the contractor’s answers directly on the checklist.

WBD payment policy

Three milestones. No mystery balance.

The standard contract ties payments to visible points in the work. Your signed project documents show the exact dollar amounts and remain the final agreement.

50%

Contract acceptance

The deposit reserves labour scheduling and allows materials, permit applications, and project scheduling to begin after funds clear.

40%

Substantial completion

The progress payment is due when the deck reaches substantial completion, as defined by the project scope.

10%

Final completion

The final payment is due after final completion and the passed final inspection.

Changes stay written: additions, deletions, substitutions, price changes, and schedule impacts require a signed change order before changed work proceeds. Invoices are issued through Jobber and are due on receipt.

No fake precision

Your price should reflect your yard, your design, and a written scope.

We would rather explain a site-specific number than advertise a range that hides the features, exclusions, or construction details that actually drive cost.